"For those of you that are asking yourself whether this site is real, the answer is yes. My first thought was that I would put my proposal on the site and it would be sent for review, and at this point someone from within the Dealflow Investment Network office would contact me as an investor so I would be more likely to pay the $249 fee. I received 8 responses from investors overnight and 2 more since then. Thanks Dealflow Investment Network."
David Kriedeman - Chris Christopherson Inc

 BLOG >> Recent

Redundancy Analysis [Farming
Posted on July 15, 2014 @ 08:31:00 AM by Paul Meagher

This is a follow up blog to my last blog, Redundancy Gets the Job Done. I felt it appropriate to provide an update to the hay making project as I made some pretty strong claims as to the importance of redundant capacity in getting time-constrained projects done on time.

On monday afternoon we had 900 square bales of hay in the loft of the barn.

We are about 35% done the making hay for the year. We'll make hay again when we have a good stretch of sunny dry weather.

All of our major pieces of machinery (two tractors, balers, rakes, and mowers) functioned without any breakdowns, however, one piece of machinery we didn't have an immediate backup for was a hay conveyor, more specifically, the motor on that conveyor because the heavy steel frame is very unlikely to fail. A bearing in the electric motor driving the conveyor mechanism gave out so we had a critical piece of equipment down while we scrambled to find a replacement motor. After some trial and error, we got a 1/3 hp motor to work (higher torque than 1 hp motors we tested). It was quite a bit slower than the 3 hp motor that failed, and it heated up alot while it worked, but it got the job done for us.

So it appears we didn't do a deep enough analysis of the redundancies we should have in place to ensure completion of the project in a timely manner (we lost a few hours in a very time constrained project). A hay conveyor breaks down so seldom that we were not thinking about it as possible point of failure in the process. It is an interesting point to ponder how we can become blinded as to what elements make up the critical path to completing a project. We can be blinded by the reliability of an element to the extent that we don't consider it something that requires redundant capacity. A more formalized process of mapping the critical path might have made us more aware of the importance of the hay conveyor in the process and the consequences of it not working properly. Perhaps we would have had redundant capacity in place.

We have an old 4 hp motor from an air compressor that we are getting ready to adapt to the hay conveyor. If we can get that working as the new motor, and fix the bearing on the old motor, then we should have enough redunancy capacity to keep going through most machinery failures on the next round of hay making.

Googling the term "Redundancy Analysis" reveals that it is mostly used as a label for a statistical technique that has nothing to do with project planning. Too bad. I think we should appropriate the term for a more useful role to describe a type of analysis that should take place before projects begin where we examine the critical path to completing the project and make decisions as to which elements of that path require redundant capacity. Redundancy analysis can get a bit involved because redundant capacity can also slow down certain types of projects such as software projects. We might think it is a good idea to have multiple programmers working on a project, and in many cases it is, however, as the number of programmers goes up, the amount of communication required to coordinate the coding effort can increase to the extent that it slows the project down to add more programmers (see Mythical Man Month). Making hay is a different type of project than a software project. I'll leave it as an open issue as to what features of a project make redundant capacity a good thing and how much redundant capacity we should have in place for certain projects.

One final observation. Why do most North American families have 2 vehicles? In part is has to do with parents both working and needing two vehicles, but even in situations where only one parent works outside the home, there are often 2 vehicles. Transportation is such a critical element of modern living that we probably recognize, at some level, the need for redundant capacity in our means of transport. Satisfying the need for redundancy, while having only one piece of equipment, is a large area of opportunity for many entrepreneurs and helps the environment by not requiring multiple copies of each piece of equipment (current solutions include equipment rental or sharing, farm machinery cooperatives, car sharing, etc...).

Permalink 

 Archive 
 

Archive


 November 2023 [1]
 June 2023 [1]
 May 2023 [1]
 April 2023 [1]
 March 2023 [6]
 February 2023 [1]
 November 2022 [2]
 October 2022 [2]
 August 2022 [2]
 May 2022 [2]
 April 2022 [4]
 March 2022 [1]
 February 2022 [1]
 January 2022 [2]
 December 2021 [1]
 November 2021 [2]
 October 2021 [1]
 July 2021 [1]
 June 2021 [1]
 May 2021 [3]
 April 2021 [3]
 March 2021 [4]
 February 2021 [1]
 January 2021 [1]
 December 2020 [2]
 November 2020 [1]
 August 2020 [1]
 June 2020 [4]
 May 2020 [1]
 April 2020 [2]
 March 2020 [2]
 February 2020 [1]
 January 2020 [2]
 December 2019 [1]
 November 2019 [2]
 October 2019 [2]
 September 2019 [1]
 July 2019 [1]
 June 2019 [2]
 May 2019 [3]
 April 2019 [5]
 March 2019 [4]
 February 2019 [3]
 January 2019 [3]
 December 2018 [4]
 November 2018 [2]
 September 2018 [2]
 August 2018 [1]
 July 2018 [1]
 June 2018 [1]
 May 2018 [5]
 April 2018 [4]
 March 2018 [2]
 February 2018 [4]
 January 2018 [4]
 December 2017 [2]
 November 2017 [6]
 October 2017 [6]
 September 2017 [6]
 August 2017 [2]
 July 2017 [2]
 June 2017 [5]
 May 2017 [7]
 April 2017 [6]
 March 2017 [8]
 February 2017 [7]
 January 2017 [9]
 December 2016 [7]
 November 2016 [7]
 October 2016 [5]
 September 2016 [5]
 August 2016 [4]
 July 2016 [6]
 June 2016 [5]
 May 2016 [10]
 April 2016 [12]
 March 2016 [10]
 February 2016 [11]
 January 2016 [12]
 December 2015 [6]
 November 2015 [8]
 October 2015 [12]
 September 2015 [10]
 August 2015 [14]
 July 2015 [9]
 June 2015 [9]
 May 2015 [10]
 April 2015 [9]
 March 2015 [8]
 February 2015 [8]
 January 2015 [5]
 December 2014 [11]
 November 2014 [10]
 October 2014 [10]
 September 2014 [8]
 August 2014 [7]
 July 2014 [5]
 June 2014 [7]
 May 2014 [6]
 April 2014 [3]
 March 2014 [8]
 February 2014 [6]
 January 2014 [5]
 December 2013 [5]
 November 2013 [3]
 October 2013 [4]
 September 2013 [11]
 August 2013 [4]
 July 2013 [8]
 June 2013 [10]
 May 2013 [14]
 April 2013 [12]
 March 2013 [11]
 February 2013 [19]
 January 2013 [20]
 December 2012 [5]
 November 2012 [1]
 October 2012 [3]
 September 2012 [1]
 August 2012 [1]
 July 2012 [1]
 June 2012 [2]


Categories


 Agriculture [77]
 Bayesian Inference [14]
 Books [18]
 Business Models [24]
 Causal Inference [2]
 Creativity [7]
 Decision Making [17]
 Decision Trees [8]
 Definitions [1]
 Design [38]
 Eco-Green [4]
 Economics [14]
 Education [10]
 Energy [0]
 Entrepreneurship [74]
 Events [7]
 Farming [21]
 Finance [30]
 Future [15]
 Growth [19]
 Investing [25]
 Lean Startup [10]
 Leisure [5]
 Lens Model [9]
 Making [1]
 Management [12]
 Motivation [3]
 Nature [22]
 Patents & Trademarks [1]
 Permaculture [36]
 Psychology [2]
 Real Estate [5]
 Robots [1]
 Selling [12]
 Site News [17]
 Startups [12]
 Statistics [3]
 Systems Thinking [3]
 Trends [11]
 Useful Links [3]
 Valuation [1]
 Venture Capital [5]
 Video [2]
 Writing [2]